CEVA Logistics Warehouse Barrier Project

RHINO-STOP®️ Truck-Guard has been installed at the new CEVA Logistics warehouse, located in Erskine Park, Sydney. The warehouse barrier has been installed adjacent to walkways separating pedestrians from forklifts and to shield valuable plant and equipment. RHINO-STOP®️ Truck-Guard has been full-scale crash tested to comply with Type G loading as described in AS/NZS 1170.1. The special engineered RHINO-STOP®️ baseplate is designed to yield, reducing the number of anchor fixings required per post and preventing damage to the concrete substrate upon impact.