royal north shore hospital 7 level car park barrier project royal north shore hospital car park top level fall protection with rhino stop sky edge royal north shore hospital car park split level protection with rhino stop sky edge 1400m of rhino stop car park barrier project at royal north shore hospital car park royal north shore hospital car park safety barrier project rhino stop sky edge perimeter edge protection with perforated infill panel and handrail rhino stop sky edge split level protection with mesh infill and handrail royal north shore hospital car park perimeter edge protection with rhino stop sky edge

Royal North Shore Hospital Car Park Barrier Project

The $1.127 billion Royal North Shore Hospital (RNSH) and Community Health Services Redevelopment is an award-winning demonstration of expert construction management. Undertaken by Thiess, the works include a new 7 level multi-storey, 567-space car park covering 23,000m2.

More than 1400 lineal metres of the RHINO-STOP® car park barrier was installed along the perimeter, split level and ramp locations. At the perimeter locations, RHINO-STOP® guardrail was configured with coloured perforated panels, providing an integrated barrier and balustrade system. Standard mesh infill panels were used at the split level locations.

Features

  • Construction by Thiess
  • 7 levels of car parking
  • Perimeter edge and split level protection.
  • 1,400m of RHINO-STOP® Type 4 guardrail
  • Perimeter edge configured with perforated infill panels and 1.3m handrail
  • Split levels configured with mesh infill and 1.1m handrail
  • RHINO-STOP® Sky-Edge guardrail on entry ramp
  • Compliant to AS/NZS 2890.1: Parking Facilities – Off Street Car Parking.
  • Compliant to the 30kN impact load described in AS/NZS 1170.1: Structural Design Actions.
  • RHINO-STOP® Guardrail FAQs